Planning a construction project with a Gantt chart on a laptop

Construction project management

Technical planning, cost control, resource management, and monitoring of indicators for better results.

Plan, measure and control time, cost and resources in the construction project

A technical approach to transforming project information into actionable decisions that can be traced, measured, and verified during execution.

WBSCPMEVMKPIs
Management and planning of construction projects
01

Fundamentals of project control

In construction, the fulfillment of a project does not depend solely on correctly executing each unit of work. The challenge lies in coordinating scope, schedule, cost, resources, quality, and risks within an environment with real constraints: supplies, interference, design changes, permits, access, variable yields, and coordination among agents.

Professional management transforms the project into a control system: each activity must be measurable, compared with a baseline, and analyzed against objective performance indicators.

Managing is not recording what happened; it is having sufficient information to anticipate deviations and act before they affect time, cost, or quality.
  • Technical scope that is broken down and measurable.
  • Schedule with relationships and critical path.
  • Cost and production integrated into the real progress.
  • Indicators for making decisions with traceability.
02

Integrated management system

Effective control requires linking the budget to the program and both to the available resources. When these variables operate independently, the project may appear to be under control even though it accumulates invisible deviations until advanced stages.

SCOPEWBS, chapters, items, and deliverables
→
TIME LIMITschedule, milestones, critical path and slack
COSTEBudget, certifications and final forecast
→
RESOURCESlabor, equipment, materials and subcontracting
03

WBS decomposition and baseline

The WBS allows the scope of the project to be transformed into manageable work packages. Each activity must have a quantity, performance, duration, cost, and responsible person. With this structure, a baseline is defined that will serve to measure actual performance.

Planned durationQuantity / PerformanceIt allows the program to be justified based on actual production expected.
ProductivityProduction / HHIt relates physical progress to the hours-man hours consumed.
Technical example

If 600 m² of wall are projected and a crew of 40 m²/day, the base duration will be 15 days. If during execution the performance falls to 32 m²/day, the expected actual duration becomes 18.75 days. The difference must be analyzed before it affects the critical path.

Planning and programming of construction projects
After structuring the scope, the programming must identify logical relationships, constraints, and activities that govern the project’s final date.

  • The activities are not programmed as a list: they are connected by precedences.
  • Each duration must have a production criterion, not just an estimated date.
  • The baseline allows you to compare what is planned with what is actually implemented.
04

Technical programming and precedence relations

Sound programming is not limited to placing bars in a calendar. It must represent the constructive logic, the dependencies between activities, the work fronts, and the constraints that condition the sequence of execution.

FSFin-Startthe most common one
SSHome-Homecontrolled locks
FFFin-Fincoordinated closure
LagDisparityTechnical expectations
05

Critical route and slack

The CPM method allows identifying the sequence of activities that determines the total timeframe. Activities with zero or minimal slack require priority follow-up, as any delay can be carried over to the final date if it is not corrected.

Total freedomHT = LS - ESIt can also be evaluated as LF - EF. A HT close to zero indicates term sensitivity.
Critical activityHT ≈ 0The unabsorbed delay can be carried over to the final deadline of the project.

Simplified schedule of activities

S1S2S3S4S5S6S7S8
Re-planning
Concrete work
Structure
Closures
Facilities
Finishes

Time management must focus on critical activities, start-up constraints, and constructive delays that allow progress to be recovered without compromising safety or quality.

06

Restricting controls: Look Ahead Planning

Long-term programming should be complemented with a 3- to 6-week window where it is reviewed whether the activities are actually executable. The goal is to release constraints before they block the work front.

  • Project approved
  • Available material
  • Allocated workforce
  • Team available
  • Front freed
  • Previous activity closed
  • Permits / access
  • Risk controlled
Technical criterion

An activity should not be considered ready to run just because it appears on the schedule; it must be free from technical, logistical, contractual, and security constraints.

The measurement of progress must integrate production, cost and time.

The isolated data does not allow for management. The technical value appears when the executed production is compared with the baseline, the actual cost, the hours consumed and the projection at the end of the work.

07

Curve S and baseline of advancement

The S Curve allows the accumulated progress of a project over time to be represented. By comparing the baseline with the actual progress and a final projection, early deviations are identified and the need for corrective actions is assessed.

Curva S conceptual
Base lineReal advance

The analysis should not be limited to the physical percentage; it should relate to cost, resources, and pending constraints.

08

Acquired value: integration of time-cost

Earned Value Management (EVM) relates physical progress, budget, and actual cost. It allows evaluating whether the project is progressing as planned and whether the cost consumed is consistent with the value of work actually executed.

PV - Planned ValuePVBudgeted value of the work that was to be executed.
EV - Earned ValueEVBudgeted value of the work actually performed.
AC - Actual CostACActual cost incurred to execute the work.
Timely performanceSPI = EV / PVSPI < 1 indicates a lower-than-expected advance.
Cost performanceCPI = EV / ACCPI < 1 indicates lower economic efficiency.
Example of integrated reading
200.000 €Predicted PVPlanned progress
180.000 €EV executedearned value
190.000 €AC realcost incurred
SPI = 0.90Relative delay in advancement
CPI = 0.95less economic efficiency
09

Yields and productivity

Productivity allows determining whether the work is being executed with the expected performance. If the physical output does not correspond to the hours-man hours consumed, the sequence, interference, logistics, quality of information, and availability of resources must be reviewed.

Production / HH

For example: 320 m² / 80 HH = 4.00 m²/HH. If the baseline was 4.50 m²/HH, there is a loss of productivity that must be attributed to verifiable causes.

The measurement of progress must answer three questions: how much has been implemented?, how much has cost?, and what impact will it have if the trend continues?

Follow-up and control of construction projects
Control, decision-making and management closure
The follow-up should convert technical indicators into actions: reprogramming, strengthening resources, releasing constraints, adjusting purchases, negotiating changes, or correcting sequences.
  • Management must be preventative, not just corrective.
  • Every deviation requires a cause, an impact, an alternative, and a responsible person.
  • The technical report must allow for quick and traceable decisions.
10

Key control indicators

AreaIndicatorTechnical readingRiskAction
Time limitReal advance vs. baselineSPI / landmarkAccumulated delayRe-programming
CostAC vs. EVCPI / trendOverchargeCorrecting resources
ProductionUnits/dayPerformanceLow productivityUnleashing restrictions
QualityNC / reworkingsRepeated causeHidden costCorrective action
ChangesImpact of time-costExchange orderContractual lossFormalize
11

Management of deviations

A deviation should not be resolved simply by moving bars on the timeline. Technical management requires determining the root cause, quantifying the impact, available alternatives, the decision made, and follow-up of the measure.

01Detecting deviation
02Analyzing the cause
03Quantifying impact
04Defining alternatives
05Assigning responsibility
06Verify result
Expected departure

Action plan or control report with impact on time, cost, quality and traceable corrective measures.

12

Support tools

Tools do not replace management: they allow information to be structured and data to be converted into decisions. Their value increases when the information model, the budget, and the program share common criteria for measurement.

PlanningMS Project · Primavera P6
CoordinationNavisworks · Synchro 4D
Data and controlAdvanced Excel · Power BI

Effective management combines planning, measurement, and responsiveness. Its goal is not only to know how much has been accomplished, but also to understand how the project is evolving, what deviations are occurring, and what the impact will be if action is not taken in time.

SPN Ingeniería y Proyectos S.L. integrates technical planning, resource control, cost monitoring and performance analysis to keep each project under control.

Do you need to plan or manage a project?

At SPN Ingeniería y Proyectos S.L., we help you plan, measure, and control time, cost, and resources.

Let's talk about your project
SPN Ingeniería y Proyectos S.L. · Technical management of projects · BarcelonaEngineering for projecting. Capacity to execute. Commitment to build.